Replacement Ditch Crossing MT758

On the 19th January a Path-or-nones work party successfully stripped down & removed a ditch crossing from its original location (Path 758C) where the banks had been severely eroded due to flood water.

The ditch crossing has been transported & reinstalled at the start of the path near the road at Newtown, this replaces a two plank crossing.